What are the key responsibilities of Fire Fighting site engineer?

HI Viewers I am Afreen Ali . I brought this video for basic 

What are the key responsibilities of Fire Fighting site engineer?

 Kindly Subscribe my channel
                  AfreenAli

1. Checking and preparation of Shop Drawings of Fire System as per NFPA standards
2. Coordination at Site with other systems.

3. Installation of Fire Fighting system as per approved drawings.
4. Preparation of As – Built Drawing
 5. Plans, schedules, conducts and coordinates the technical and management aspects of the assigned projects. Manages the Technical Supervisors and Technicians to get up to date information for forecasting site progress on daily, weekly,and monthly basis. 
6.Receives all the equipment, materials, and tools as requested and reconciling them with the requested orders to ensure accuracy, completeness, and condition of items.
7.Ensures that all the necessary materials required to start the work for the day has been acquired and made ready at least one or two days beforehand to ensure quick deployment in at the start of the work to maximize time on site.

8.Ensures that the team on site has the required knowledge for installation, testing and commissioning the system and providing any kind of assistance if requested and when required.

9.Knows the work to foresee any problems during the installation so that proper corrective action can be undertaken to resolve the issue. This includes coordinating with the required on-site people to find a solution to the problem.
10.Maintains an accurate attendance of employees on site.

11.Completes all the tasks required and requested and to report their status during the weekly meeting and as per the requirement of the site.

12.Ensures that the standard of the installed works is in accordance with the technical and quality specification of the contract and quality of workmanship is maintained at high standards

13.Keeps track of order variations on site and coordinates with the proper personnel for ordering the materials and ensuring prompt delivery to site.

14.Resolves all issues that the Site team might face during installation, testing and commissioning of the project phases.Ensures that all unresolved site issues are promptly conveyed to the Division Manager to be resolved in a timely                 manner as per standard procedures.
15.Approves As-Built drawings and ensuring that drawings are produced in a way that is useful for commissioning,maintenance and handing over to the client. 

16.Attends all the internal and/or external meetings as required/requested by the Client, Consultant or Division Management.
17.Ensures all the works will comply with the QSHE rules and regulations and as per FSG's Policies.
18.Performs other related duties as maybe assigned by the Management.