What are the key responsibilities of Fire Fighting site engineer?
Kindly Subscribe my channel
AfreenAli
1. Checking and preparation of Shop Drawings of Fire System as per NFPA
standards
2. Coordination at Site with other systems.
3. Installation of Fire Fighting system as per approved drawings.
4. Preparation of As – Built Drawing
5. Plans, schedules, conducts and coordinates the
technical and management aspects of the assigned projects. Manages the Technical Supervisors and Technicians to get up
to date information for forecasting site progress on daily, weekly,and monthly
basis.
6.Receives all the equipment, materials, and tools as
requested and reconciling them with the requested orders to ensure accuracy,
completeness, and condition of items.
7.Ensures that all the necessary materials required to start
the work for the day has been acquired and made ready at least one or two days
beforehand to ensure quick deployment in at the start of the work to maximize
time on site.
8.Ensures that the team on site has the required knowledge
for installation, testing and commissioning the system and providing any kind
of assistance if requested and when required.
9.Knows the work to foresee any problems during the
installation so that proper corrective action can be undertaken to resolve the
issue. This includes coordinating with the required on-site people to find a
solution to the problem.
10.Maintains an accurate attendance of employees on site.
11.Completes all the tasks required and requested and to report
their status during the weekly meeting and as per the requirement of the site.
12.Ensures that the standard of the installed works is in
accordance with the technical and quality specification of the contract and
quality of workmanship is maintained at high standards
13.Keeps track of order variations on site and coordinates with
the proper personnel for ordering the materials and ensuring prompt delivery to
site.
14.Resolves all issues that the Site team might face during
installation, testing and commissioning of the project phases.Ensures that all
unresolved site issues are promptly conveyed to the Division Manager to be
resolved in a timely manner as per standard procedures.
15.Approves As-Built drawings and ensuring that drawings are
produced in a way that is useful for commissioning,maintenance and handing
over to the client.
16.Attends all the internal and/or external meetings as
required/requested by the Client, Consultant or Division Management.
17.Ensures all the works will comply with the QSHE rules and
regulations and as per FSG's Policies.
18.Performs other related duties as maybe assigned by the
Management.