Thursday, 2 November 2017

What are the key responsibilities of hvac site engineer?



HI Viewers I am Afreen Ali . I brought this video for basic 

What are the key responsibilities of hvac site engineer?

 Kindly Subscribe my channel
                  AfreenAli

  1. Get approved HVAC Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Project Engineer.
  2. Ensure the HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories  are available and approved by Inspection department  prior to installation
  3. Ensure sufficient hand tools, power tools, ladder and scaffolding are available for installation
  4. Coordinate with other discipline and ensure  site clearance is available to start the HVAC Activities
  5. Arrange the sufficient manpower such as Supervisor, Foreman, Duct fitter, pipe fitter, Assistant duct and pipe fitter etc.., and ensure all of them attended safety orientation and having proper PPE’s prior start installation activities at site
  6. Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor (or) Foreman and inform them to shift the required ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.
  7. Prior to start HVAC activities notify to QC Personal for surveillance to ensure the quality work

  8. To maintain safe all construction  HVAC  and Chilled water piping activities are carried out in accordance with the Company’s safety policies and procedures; ensure that appropriate safety and protective equipment is used by Company & Contractor staff.

  9. Closely monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specificationand get daily progress report from site supervisor (or) foreman and update to project Engineer (or) Manager

  10. Preparing relevant documents to conduct inspection for completed installation activities and raise RFI to QC-Inspector (To ensure that any activity offered for inspection has an attachment of IFC drawing, method statement (if required), Inspection & Test Plan (ITP) followed by check list)

  11. Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standard

  12. Preparing the relevant documents to Conduct Testing inspection such as Duct light testing for Ducts and Hydro test for Above ground and Underground chilled water piping’s, systems.
  13. Active involvement in weekly meetings with the Project management & QC Supervisor and manager to resolve the site related issues.
  14. Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s.
  15. Assist the Commissioning Team on Testing, Adjusting & Balancing (TAB) stages of the Air and Hydronic Piping’s.
  16. Assist the Project Engineer during Preparation of final Test Reports, as built drawings, Operation & Maintenance manual and handing over the project to client

5 comments:

  1. AC replacement online quotes This particular is usually apparently essential and moreover outstanding truth along with for sure fair-minded and moreover admittedly useful My business is looking to find in advance designed for this specific useful stuffs…

    ReplyDelete
  2. Good Overal Information related to HVAC Site execution work.

    ReplyDelete

  3. Thanks for sharing this valuable information with us. This is the best information related to
    HVAC

    ReplyDelete